欢迎来到重庆和泰液压升降机械厂 ,期待与您的合作!

关于我们|联系我们|收藏本站

重庆和泰液压升降机械厂

重庆和泰液压升降机械厂 一站式液压升降平台生产服务商

全国服务热线189-0831-8192

重庆和泰液压升降机械厂

升降货梯如何安全使用?

来源:重庆和泰液压升降机械厂 发布日期:2023-01-05 14:30:47

1、使用升降货梯必须配置经过专门培训,考试合格,持证上岗的操作人员。 
Use cargo lifter must be configured through specialized training, examination, certificates of professional operators.
2、升降货梯操作人员必须按照机械设备的保养规定,在执行各项检查和保养后方可启动升降平台,工作前应检查升降平台车的工作范围,清除妨碍升降平台车回转及行走的障碍物。支撑是升降货梯操作的一项重要准备工作,应选择平整的地面,如地基松软或起伏不平,必须用枕木垫实后,才可进行工作。 
Cargo lift operators must follow the provisions of mechanical equipment maintenance, and after the implementation of the inspection and maintenance before they start lifting platform, lifting platform should check the working range of the car before work, remove prejudice lift platform trucks turning and walking obstructions. Support is an important cargo lifter operation preparatory work should choose flat ground, such as soft or rough ground, the pad must be real sleepers before work.
3、升降货梯一般应先起下臂,再起中臂,最后起上臂。在升降平台回转操作过程中,必须在下臂起升一定高度后方可进行回转,回转应缓慢,同时注意剪臂及平台对各设备的距离是否满足安全需要。 在升降货梯上工作的操作人员应佩带安全带,在带电区域工作时,应将车体按规定进行接地,升降平台登高作业应由工作负责人进行指挥。
Huoti general should be from the lower arm, renewed in the arm, and finally from the upper arm. In the process of turning operation of the lift platform must be carried out before starting the next swing arm up to a certain height, the rotation should be slow, taking care to cut the distance between the arm and the platform of the device meets the safety requirements. The operator on Huoti work should wear seat belts when working in the charged area, the body should be grounded in accordance with regulations, the lifting platform climbing operations carried out by the command of the responsible person.
4、升降货梯作业前,工作负责人应向操作人员,进行技术和安全交待,内容应包括:工作内容及要求;安全注意事项及危险点;人员分工情况及责任范围。工作负责人除要对车况 和操作人员进行检查以外,还要负责查看地形环境、起降是否符合安全技术措施的要求或事先制定的工作方案,如有出入,则应制定出相应的措施后方能开始工作。 
Before lifting freight operations, responsible person should operators, technical and security account, which shall include: job content and requirements; safety precautions and dangerous point;personnel division of labor and responsibility. In addition to the work of the person in charge of the condition and operations personnel to inspect, but also for viewing terrain, landing compliance with safety requirements or technical measures to develop the program of work in advance, if different, should develop appropriate measures only after work.

 


咨询热线

189-0831-8192